All projects
28 October 2020
Leeuwerikenbridge – Coevorden
The new Leeuweriken-bridge is a bascule bridge with a steel deck and two fixed concrete spans.
The deck of the bridge has a span of almost 12 meters and the two bridges have a span of approx. 15 meters. Machinefabriek Emmen was commissioned by the municipality of Coevorden to provide the complete design of the table bridge by means of 3D.